Prestec continued their waterproofing works to the concrete slab above Moorgate Tube Station in London using Flexcrete’s Cemprotec Levelling Coat.
This project is due to be completed over several visits during 2016/2017.
Job Completion
March 2017
Client
Allard Construction
Duration
3 weeks
Prestec continued their waterproofing works to the concrete slab above Moorgate Tube Station in London using Flexcrete’s Cemprotec Levelling Coat.
This project is due to be completed over several visits during 2016/2017.