Refurbishment works are now completed on Venetian Bridge at Clacton-On-Sea. We reinstated all the repairs using Flexcrete materials alongside DuoGuard Hybrid Anode steel reinforcement anti-corrosion system. The final decorative coatings to the structure were undertaken using Flexcrete coatings to the beams, spandrels and soffits whilst the new deck was coated in red using Tremco’s Rpaide System.
An extremely challenging yet rewarding project that included carpentry, rendering, concrete repairs, hydro demolition, anti-corrosion systems, structural reinforcement replacement, tarmacking, plumbing and decoration works.