Prestec completed this cavity membrane project using Delta Membranes materials including a V3 Dual ground water sump and pump unit and a V3 Foul pumping station. The ground water drainage system on this project was Delta’s below slab detail DW-129A-1-(c).
Completed Cavity Membrane Project
Job Completion
January 2019
Client
Bourne Construction
Similar Projects
Take a look at some of our other projects below.

Installation of Cavity Drain System to 5 New Properties in London
Job Completion
July 2019
Client
YOGO Group

Ongoing Waterproofing Works for Galamast Construction Ltd
Client
Galamast Construction Ltd
Duration
Ongoing