Prestec continued their waterproofing works to the concrete slab above Moorgate Tube Station in London using Flexcrete’s Cemprotec Levelling Coat.
This project is due to be completed over several visits during 2016/2017.
Completed
October 2016
Client
BTR Building Services
Duration
2 weeks
Prestec continued their waterproofing works to the concrete slab above Moorgate Tube Station in London using Flexcrete’s Cemprotec Levelling Coat.
This project is due to be completed over several visits during 2016/2017.
Take a look at some of our other projects below.
Job Completion
July 2019
Client
YOGO Group
Client
Galamast Construction Ltd
Duration
Ongoing