Prestec were approached by a local resident to undertake some strengthening works following a structural report supplied during their renovation works. We fully removed the finishes prior to undertaking the mechanical preparation to structure, we used Webertec force carbon plate including Weber’s EP structural adhesive as the solution.
Structural Strengthening – London